Dcdu 03b руководство

DBS3900 (ICR)

Installation Guide

This chapter describes the procedure for installing the DCDU-03B, DCDU-11B or DCDU-12B

in the IMB03.

Context

The method of installing the DCDU-11B and DCDU-12B is the same as the method of installing

the DCDU-03B. This section uses the DCDU-03B as an example.

Procedure

Step 1 Move the mounting ears on the DCDU-03B, as shown in

1.

2.

Figure 13-4 Installing the DCDU-03B

Step 2 Install the DCDU-03B into the corresponding slot in the IMB03. Then tighten the four M6x16

screws on the mounting ears to 3 N·m (26.55 lbf·in.), as shown in

Figure 13-5 Installing the DCDU-03B

Issue 12 (2015-04-30)

Remove the four M4 screws from the mounting ear on each side of the DCDU-03B.

Move each mounting ear backwards by one hole and tighten the four removed M4 screws

on the mounting ear to 1.2 N·m (10.62 lbf·in.).

Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

13 Installing Components in the IMB03

Figure

13-4.

Figure

13-5.

93

  • Главная

    Электричество и Электроника

    Телекоммуникация и Телевидение

    Модуль Связи
Использование: Телефон, Компьютер
Тип: Беспроводный
Поддержка сети: GSM
Содержание информации: Данные
Сертификация: CE
Состояние: Новый

Описание Товара

Информация о Компании

Основная Информация.

Транспортная Упаковка

Carton Packing

Производственная Мощность

9999/Month

Описание Товара

Оригинальные Huawei DC-дю -48 В постоянного тока блоки распределения DCDU-03B

Модель: DCDU-03B

Вход: -48 В, 100A макс.
Выход: -48 В постоянного тока, 25A Max, на выход, 100A макс.

Original Huawei DC-Du -48V DC Distribution Units Dcdu-03b
Original Huawei DC-Du -48V DC Distribution Units Dcdu-03b
Original Huawei DC-Du -48V DC Distribution Units Dcdu-03b
Original Huawei DC-Du -48V DC Distribution Units Dcdu-03b

Отправить ваш запрос напрямую данному поставщику

INSTALLATION OF DCDU-03B IN TMC RACK Installation of BBU3900 in TMC11H Cabinet 224 © Huawei Telecom <strong>Implementation</strong> Process & Guidelines INSTALLATION OF BBU 3900 IN TMC RACK INSTALLATION OF BBU 3900 CABLES

DC Cable Installation for BBU3900 & RRU 225 © Huawei Telecom <strong>Implementation</strong> Process & Guidelines Procedure of DC Power Cabling, The DC RRU Power Cable is connected to one of the LOAD0 to LOAD5 terminals of the DCDU-03B. When connecting the DC RRU power cable to the DCDU-03B,must add an OT terminal to the shielding layer. Then fix the OT terminal to the corresponding PGND terminal of the DCDU-03B.

  • Page 1 and 2:

    IMPLEMENTATION GUIDELINES & QUALITY

  • Page 3 and 4:

    3 © Huawei Telecom Implementation

  • Page 5 and 6:

    CONTENTS ENVIRONMENT, HEALTH & SAFE

  • Page 7 and 8:

    Implementation Guidelines & Quality

  • Page 9 and 10:

    Before you Start -Site Safety Requi

  • Page 11 and 12:

    11 © Huawei Telecom Implementation

  • Page 13 and 14:

    13 © Huawei Telecom Implementation

  • Page 15 and 16:

    Personal Protective Equipments- Saf

  • Page 17 and 18:

    17 © Huawei Telecom Implementation

  • Page 19 and 20:

    19 © Huawei Telecom Implementation

  • Page 21 and 22:

    21 © Huawei Telecom Implementation

  • Page 23 and 24:

    23 © Huawei Telecom Implementation

  • Page 25 and 26:

    Don‘t Forget: Only one person on

  • Page 27 and 28:

    Machinery/ Equipment Safety-Hand To

  • Page 29 and 30:

    29 © Huawei Telecom Implementation

  • Page 31 and 32:

    31 © Huawei Telecom Implementation

  • Page 33 and 34:

    Do not overload power sockets. Ne

  • Page 35 and 36:

    Fire Safety-Fire Extinguishers Clas

  • Page 37 and 38:

    Effects of RF Exposure RF Safety-Co

  • Page 39 and 40:

    39 © Huawei Telecom Implementation

  • Page 41 and 42:

    Radio relay (Microwave / fixed poin

  • Page 43 and 44:

    43 © Huawei Telecom Implementation

  • Page 45 and 46:

    45 © Huawei Telecom Implementation

  • Page 47 and 48:

    47 © Huawei Telecom Implementation

  • Page 49 and 50:

    Huawei BTS-GSM & Node-B Product Ove

  • Page 51 and 52:

    51 © Huawei Telecom Implementation

  • Page 53 and 54:

    53 © Huawei Telecom Implementation

  • Page 55 and 56:

    55 © Huawei Telecom Implementation

  • Page 57 and 58:

    BTS3900-Node-B Cabinet Appearances

  • Page 59 and 60:

    59 © Huawei Telecom Implementation

  • Page 61 and 62:

    61 © Huawei Telecom Implementation

  • Page 63 and 64:

    UPEU Panel-BTS3900/3900A/DBS3900-GS

  • Page 65 and 66:

    Module/Sub module Name BBU3900 Modu

  • Page 67 and 68:

    UFLP Panel-BTS3900/3900A/DBS3900-GS

  • Page 69 and 70:

    The FAN Unit has following function

  • Page 71 and 72:

    Fan Box In BTS 3900A-APM30H & TMC11

  • Page 73 and 74:

    Hert Power Monitoring Interface uni

  • Page 75 and 76:

    GRFU (GSM Radio Frequency Unit)-BTS

  • Page 77 and 78:

    DC/DC Power System (+24VDC TO -48VD

  • Page 79 and 80:

    79 © Huawei Telecom Implementation

  • Page 81 and 82:

    PDU (Power Distribution Unit in APM

  • Page 83 and 84:

    EPS Subrack in APM30H Cabinet(Ver B

  • Page 85 and 86:

    Function of DCDU-02 are as below, 8

  • Page 87 and 88:

    DCDU Type DC O/P Terminal DCDU-03D

  • Page 89 and 90:

    Panels On DC-RRU3004 Module in DBS3

  • Page 91 and 92:

    Panels on DC-RRU3008,V1 Module in D

  • Page 93 and 94:

    Panels on DC-RRU3008,V2 Module in D

  • Page 95 and 96:

    Panels On RRU3004(AC) Module in DBS

  • Page 97 and 98:

    Panels On RRU3008(AC)V1 Module in D

  • Page 99 and 100:

    Panels On RRU3008(AC)V2 Module in D

  • Page 101 and 102:

    Boards & Modules of BBU3900(CMPT) —

  • Page 103 and 104:

    Boards & Modules of BBU3900(HECM) —

  • Page 105 and 106:

    Ports on Mandatory Boards 105 © Hu

  • Page 107 and 108:

    107 © Huawei Telecom Implementatio

  • Page 109 and 110:

    Physical ports of the DC RRU3606-CD

  • Page 111 and 112:

    111 © Huawei Telecom Implementatio

  • Page 113 and 114:

    Boards & Modules of BBU3900(WBBP) —

  • Page 115 and 116:

    115 © Huawei Telecom Implementatio

  • Page 117 and 118:

    117 © Huawei Telecom Implementatio

  • Page 119 and 120:

    RRU3804/3801/3806 RRU Panel-Node-B

  • Page 121 and 122:

    The functions of the RRU3805 are as

  • Page 123 and 124:

    Pre-Installation Site Survey (RFI)

  • Page 125 and 126:

    Clearance for installing BTS 125 ©

  • Page 127 and 128:

    Clearance Required For BTS3900A 127

  • Page 129 and 130:

    INSTALLATING RRU ON POLE, 129 © Hu

  • Page 131 and 132:

    @ 23 Deg. Centigrade Sl. No. 131 ©

  • Page 133 and 134:

    Sl. No. Product 133 © Huawei Telec

  • Page 135 and 136:

    Pre-Installation Site Survey & Chec

  • Page 137 and 138:

    OPENCASE INSPECTION/UNPACKING 137

  • Page 139 and 140:

    Unpacking , Opencase Inspection (In

  • Page 141 and 142:

    MISSING/SHORT SHIPPED MATERIALS DEL

  • Page 143 and 144:

    TOOLS FOR BTS INSTALLATION 143 © H

  • Page 145 and 146:

    145 © Huawei Telecom Implementatio

  • Page 147 and 148:

    Checking of Installed Modules & Cab

  • Page 149 and 150:

    149 © Huawei Telecom Implementatio

  • Page 151 and 152:

    Correct & Defective isolation Pad I

  • Page 153 and 154:

    Cabinet Installatio n Installation

  • Page 155 and 156:

    BTS Cabinet Grounding (PGND) -Incas

  • Page 157 and 158:

    157 © Huawei Telecom Implementatio

  • Page 159 and 160:

    159 © Huawei Telecom Implementatio

  • Page 161 and 162:

    Connection of the FE cable FE0 161

  • Page 163 and 164:

    Monitoring Signal Cabling ( 2 Cabin

  • Page 165 and 166:

    ANT_RXB ANT_TX/RXA 165 © Huawei Te

  • Page 167 and 168:

    167 © Huawei Telecom Implementatio

  • Page 169 and 170:

    Defective Picture 6A MCB used for B

  • Page 171 and 172:

    START Engineering /SoP Documents, C

  • Page 173 and 174: 173 © Huawei Telecom Implementatio
  • Page 175 and 176: 4-ALIGN BASE & INSTALL BOLT WITH SP
  • Page 177 and 178: Installation of Cabinet-BTS3900A (S
  • Page 179 and 180: PGND & Equipotential grounding-BTS3
  • Page 181 and 182: Checking the internal Cables-BTS390
  • Page 183 and 184: DC Power Cabling (Incase of APM30H,
  • Page 185 and 186: Installation of EMUA & its Cabling-
  • Page 187 and 188: Monitoring Signal Cabling(APM30H,Ve
  • Page 189 and 190: Checking the internal Cables-BTS390
  • Page 191 and 192: DC Power Cabling (Incase of TMC11H,
  • Page 193 and 194: DC Power Cabling -DCDU-06 to BBU &
  • Page 195 and 196: Installation of Optional Modules-EM
  • Page 197 and 198: 197 © Huawei Telecom Implementatio
  • Page 199 and 200: Monitoring Signal Cabling(TMC11H,Ve
  • Page 201 and 202: APM30/ TMC11 CABINET RFC CABINET BA
  • Page 203 and 204: 203 © Huawei Telecom Implementatio
  • Page 205 and 206: 205 © Huawei Telecom Implementatio
  • Page 207 and 208: 207 © Huawei Telecom Implementatio
  • Page 209 and 210: DBS3900 BTS INSTALLATION 209 © Hua
  • Page 211 and 212: PGND Cable Installation for APM30H
  • Page 213 and 214: 213 © Huawei Telecom Implementatio
  • Page 215 and 216: 215 © Huawei Telecom Implementatio
  • Page 217 and 218: Install the FE Transfer Cable (FE T
  • Page 219 and 220: Installation of Monitoring Cables o
  • Page 221 and 222: Grounding of RRU DC Power Cable shi
  • Page 223: 223 © Huawei Telecom Implementatio
  • Page 227 and 228: Installation of Monitoring Cables i
  • Page 229 and 230: 229 © Huawei Telecom Implementatio
  • Page 231 and 232: INSTALLATION OF RRU 231 © Huawei T
  • Page 233 and 234: 233 © Huawei Telecom Implementatio
  • Page 235 and 236: Installation Procedures of RRU Inst
  • Page 237 and 238: Installation of RRU Brackets on met
  • Page 239 and 240: 239 © Huawei Telecom Implementatio
  • Page 241 and 242: 241 © Huawei Telecom Implementatio
  • Page 243 and 244: 243 © Huawei Telecom Implementatio
  • Page 245 and 246: 245 © Huawei Telecom Implementatio
  • Page 247 and 248: Opening of Cabling Cavity in RRU300
  • Page 249 and 250: DC Power Cable Installation for RRU
  • Page 251 and 252: 251 © Huawei Telecom Implementatio
  • Page 253 and 254: Closing of Cabling Cavity for RRU30
  • Page 255 and 256: Labels for RRU‟s Cables on Tower
  • Page 257 and 258: 257 © Huawei Telecom Implementatio
  • Page 259 and 260: DBS3900 -CDMA BTS INSTALLATION 259
  • Page 261 and 262: Install in APM30H BBU3900- CDMA Ins
  • Page 263 and 264: Space Requirement for Base of APM30
  • Page 265 and 266: Installation of PGND cable for Base
  • Page 267 and 268: Installation of Power cable for APM
  • Page 269 and 270: 269 © Huawei Telecom Implementatio
  • Page 271 and 272: 271 © Huawei Telecom Implementatio
  • Page 273 and 274: Installation of GPS Clock Cable for
  • Page 275 and 276:

    Installation of Cable for BBU3900 i

  • Page 277 and 278:

    277 © Huawei Telecom Implementatio

  • Page 279 and 280:

    279 © Huawei Telecom Implementatio

  • Page 281 and 282:

    Installation of RRU3606 on Metal Po

  • Page 283 and 284:

    Installation of RRU3606 on Metal Po

  • Page 285 and 286:

    Installation of RRU3606 on Channel

  • Page 287 and 288:

    Installation of RRU3606 on the Util

  • Page 289 and 290:

    289 © Huawei Telecom Implementatio

  • Page 291 and 292:

    291 © Huawei Telecom Implementatio

  • Page 293 and 294:

    293 © Huawei Telecom Implementatio

  • Page 295 and 296:

    295 © Huawei Telecom Implementatio

  • Page 297 and 298:

    NO BTS3900 WCDMA Installation Proce

  • Page 299 and 300:

    Note- BTS3900 WCDMA Installation Pr

  • Page 301 and 302:

    Installation of Transmission Cable

  • Page 303 and 304:

    WCDMA (Node-B) Typical Configuratio

  • Page 305 and 306:

    WCDMA (Node-B) -Tx diversity Config

  • Page 307 and 308:

    BTS3900A WCDMA INSTALLATION 307 ©

  • Page 309 and 310:

    Note- 309 © Huawei Telecom Impleme

  • Page 311 and 312:

    Check of-E1/T1,FE&CPRI Cables in BT

  • Page 313 and 314:

    DBS3900 WCDMA INSTALLATION 313 © H

  • Page 315 and 316:

    BBU3900- WCDMA Installation Scenari

  • Page 317 and 318:

    317 © Huawei Telecom Implementatio

  • Page 319 and 320:

    Cable Connection of BBU3900 in APM3

  • Page 321 and 322:

    Cable Connection of BBU3900 in APM3

  • Page 323 and 324:

    Cable Connection of BBU3900 in TMC1

  • Page 325 and 326:

    RRU- WCDMA Installation Scenario No

  • Page 327 and 328:

    Label Grounding of Equipments insid

  • Page 329 and 330:

    329 © Huawei Telecom Implementatio

  • Page 331 and 332:

    Examples of Site Cabling inside She

  • Page 333 and 334:

    Example of E1/Alarm Cabling in DDF

  • Page 335 and 336:

    335 © Huawei Telecom Implementatio

  • Page 337 and 338:

    GSM ANTENNA & FEEDER SYSTEM INSTALL

  • Page 339 and 340:

    Tools Required For Antenna Installa

  • Page 341 and 342:

    Cut the Feeder-After measuring the

  • Page 343 and 344:

    343 © Huawei Telecom Implementatio

  • Page 345 and 346:

    Down Tilt GSM Antenna Alignment Pro

  • Page 347 and 348:

    FEEDER LINE INSTALLATION 347 © Hua

  • Page 349 and 350:

    349 © Huawei Telecom Implementatio

  • Page 351 and 352:

    Recommended Feeder support distance

  • Page 353 and 354:

    Example of Correct Feeder Cable Rou

  • Page 355 and 356:

    Jumper Cable Installation (Antenna

  • Page 357 and 358:

    3 meter Jumper Antenna jumper cable

  • Page 359 and 360:

    Unacceptable Jumper Cable Installat

  • Page 361 and 362:

    RF FEEDERS CONNECORIZATION PROCEDUR

  • Page 363 and 364:

    Connectorization Procedure ( 7/8”

  • Page 365 and 366:

    Connectorization Procedure ( 7/8”

  • Page 367 and 368:

    Connectorization Procedure ( 7/8”

  • Page 369 and 370:

    Connectorization Procedure ( 7/8”

  • Page 371 and 372:

    Precautions for Feeder Groundings

  • Page 373 and 374:

    FEEDER GROUNDIN G bar Recommendatio

  • Page 375 and 376:

    Unacceptable Feeder Groundings 375

  • Page 377 and 378:

    Unacceptable Feeder Groundings GROU

  • Page 379 and 380:

    Recommended Locations for Grounding

  • Page 381 and 382:

    Recommended Locations for Grounding

  • Page 383 and 384:

    FEEDERS WATERPROOFING 383 © Huawei

  • Page 385 and 386:

    385 © Huawei Telecom Implementatio

  • Page 387 and 388:

    • 1.CONNECTION TO BE TAPED USING

  • Page 389 and 390:

    WEATHERPROOFING OF CONNECTORS ARE N

  • Page 391 and 392:

    GPS SYSTEM INSTALLATION 391 © Huaw

  • Page 393 and 394:

    Requirements for GPS Antenna Instal

  • Page 395 and 396:

    GPS Antenna 395 © Huawei Telecom I

  • Page 397 and 398:

    397 © Huawei Telecom Implementatio

  • Page 399 and 400:

    Seal the connector 1. Every time yo

  • Page 401 and 402:

    Install the Feeder into the Equipme

  • Page 403 and 404:

    1. Positions of the labels The posi

  • Page 405 and 406:

    2. Install the heat-shrinkable tube

  • Page 407 and 408:

    3. Cut the feeder insulation layer

  • Page 409 and 410:

    RTN605,IDU PRODUCT DESCRIPTION 409

  • Page 411 and 412:

    IDU 605 1A IDU 605 1B IDU 605 2B ID

  • Page 413 and 414:

    Physical & Electrical Specification

  • Page 415 and 416:

    415 © Huawei Telecom Implementatio

  • Page 417 and 418:

    IF Processing Ethernet Layer 2 Serv

  • Page 419 and 420:

    Product Description-ODU for RTN600

  • Page 421 and 422:

    421 © Huawei Telecom Implementatio

  • Page 423 and 424:

    423 © Huawei Telecom Implementatio

  • Page 425 and 426:

    The hybrid coupler has three types

  • Page 427 and 428:

    RTN620,IDU Configuration Modes & Se

  • Page 429 and 430:

    429 © Huawei Telecom Implementatio

  • Page 431 and 432:

    RTN620,IDU IF0A/IF0B Board & Interf

  • Page 433 and 434:

    The SL4 receives & transmits 1xSTM-

  • Page 435 and 436:

    RTN620,IDU SLE/SDE Board & Interfac

  • Page 437 and 438:

    RTN620,IDU PO1/PH1/PD1 Board & Inte

  • Page 439 and 440:

    439 © Huawei Telecom Implementatio

  • Page 441 and 442:

    441 © Huawei Telecom Implementatio

  • Page 443 and 444:

    443 © Huawei Telecom Implementatio

  • Page 445 and 446:

    445 © Huawei Telecom Implementatio

  • Page 447 and 448:

    IDU 605 Installation in 19” Cabin

  • Page 449 and 450:

    449 © Huawei Telecom Implementatio

  • Page 451 and 452:

    451 © Huawei Telecom Implementatio

  • Page 453 and 454:

    IDU 605 IF Jumper Cable Installatio

  • Page 455 and 456:

    Steps for installation of E1 Cables

  • Page 457 and 458:

    IDU 605 Ethernet Cable Installation

  • Page 459 and 460:

    1. IF Interface 2. ODU Power Switch

  • Page 461 and 462:

    Rack Mounting Ears for 19” Rack 4

  • Page 463 and 464:

    Fix the IDU 463 © Huawei Telecom I

  • Page 465 and 466:

    Pre-requisite of Board Installation

  • Page 467 and 468:

    IF Cable Installation at IDU end -I

  • Page 469 and 470:

    Prerequisite The IDU must be correc

  • Page 471 and 472:

    E1(SL62PO1 Board) Cable Installatio

  • Page 473 and 474:

    Installing the ODU with Antenna 473

  • Page 475 and 476:

    Installing the ODU with the Wavegui

  • Page 477 and 478:

    One ODU on One Single-Polarized Ant

  • Page 479 and 480:

    Two ODU on One Single-Polarized Ant

  • Page 481 and 482:

    Installing ODU on Hybrid Coupler Pr

  • Page 483 and 484:

    One ODU on One Single-Polarized Ant

  • Page 485 and 486:

    Installing the ODU with the Coaxial

  • Page 487 and 488:

    Installing One ODU on One Single-Po

  • Page 489 and 490:

    Installing Two ODUs on One Single-P

  • Page 491 and 492:

    Installation of ODU on one Dual Pol

  • Page 493 and 494:

    Installation Steps of MW Antenna In

  • Page 495 and 496:

    IF Connectorization-N Connector Bot

  • Page 497 and 498:

    497 © Huawei Telecom Implementatio

  • Page 499 and 500:

    499 © Huawei Telecom Implementatio

  • Page 501 and 502:

    501 © Huawei Telecom Implementatio

  • Page 503 and 504:

    503 © Huawei Telecom Implementatio

  • Page 505 and 506:

    RTN-910,IDU PRODUCT DESCRIPTION 505

  • Page 507 and 508:

    Cross-connect capacity System contr

  • Page 509 and 510:

    IDU-RTN910-Boards(CSHA/CSHB/CSHC) T

  • Page 511 and 512:

    IDU-RTN910-Boards(CSHA/CSHB/CSHC) F

  • Page 513 and 514:

    IDU-RTN910-Boards(CSHD) Function Ba

  • Page 515 and 516:

    515 © Huawei Telecom Implementatio

  • Page 517 and 518:

    517 © Huawei Telecom Implementatio

  • Page 519 and 520:

    519 © Huawei Telecom Implementatio

  • Page 521 and 522:

    IDU-RTN910-Boards(EM6T/EM6F) The EM

  • Page 523 and 524:

    523 © Huawei Telecom Implementatio

  • Page 525 and 526:

    IDU-RTN910-Boards(ML1/MD1) The ML1

  • Page 527 and 528:

    527 © Huawei Telecom Implementatio

  • Page 529 and 530:

    529 © Huawei Telecom Implementatio

  • Page 531 and 532:

    531 © Huawei Telecom Implementatio

  • Page 533 and 534:

    533 © Huawei Telecom Implementatio

  • Page 535 and 536:

    535 © Huawei Telecom Implementatio

  • Page 537 and 538:

    537 © Huawei Telecom Implementatio

  • Page 539 and 540:

    539 © Huawei Telecom Implementatio

  • Page 541 and 542:

    541 © Huawei Telecom Implementatio

  • Page 543 and 544:

    Hold front Panel of the board with

  • Page 545 and 546:

    545 © Huawei Telecom Implementatio

  • Page 547 and 548:

    IDU 910 Power Cable Installation As

  • Page 549 and 550:

    IDU 910 E1,FE,XPIC Cable Installati

  • Page 551 and 552:

    Hold front Panel of the board with

  • Page 553 and 554:

    553 © Huawei Telecom Implementatio

  • Page 555 and 556:

    555 © Huawei Telecom Implementatio

  • Page 557 and 558:

    SITE CLEANING & FINISHING 557 © Hu

  • Page 559 and 560:

    SITE CLEANING & FINISHING 559 © Hu

  • Page 561 and 562:

    PROJECT QUALITY PROCESS & 561 © Hu

  • Page 563 and 564:

    563 © Huawei Telecom Implementatio

  • Page 565 and 566:

    CORE CONCEPT OF QUALITY How to Cond

  • Page 567 and 568:

    Main purpose is to: QUALITY PROCESS

  • Page 569 and 570:

    569 © Huawei Telecom Implementatio

  • Page 571 and 572:

    P R O J E C T M A N A G E M E N T I

  • Page 573:

    573 © Huawei Telecom Implementatio

Huawei BBU3900 Hardware Maintenance Manual

  1. Manuals
  2. Brands
  3. Huawei Manuals
  4. Accessories
  5. BBU3900
  6. Hardware maintenance manual

  • Contents

  • Table of Contents

  • Bookmarks

Quick Links

BBU3900

V200

Hardware Maintenance Guide

Issue

03

Date

2010-06-05

HUAWEI TECHNOLOGIES CO., LTD.

loading

Related Manuals for Huawei BBU3900

Summary of Contents for Huawei BBU3900

  • Page 1
    BBU3900 V200 Hardware Maintenance Guide Issue Date 2010-06-05 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 3
    All other trademarks and trade names mentioned in this document are the property of their respective holders. Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope.
  • Page 5: About This Document

    About This Document Introduction This document describes the routine hardware maintenance of the BBU3900. The maintenance tasks consist of power supply and grounding system maintenance, cabinet maintenance, and power-on and power-off operations. This document also describes the procedures for replacing the components.

  • Page 6
    This describes how to power on and power off the BBU3900. During power-on, you need to check the status of the LEDs on the BBU3900. As for the power-off, the operation in a normal situation and that in an emergency are different.
  • Page 7
    Multi-level menus are in boldface and separated by the «>» signs. For example, choose File > Create > Folder. Keyboard Operations The keyboard operations that may be found in this document are defined as follows. Issue 03 (2010-06-05) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 8
    Press the primary mouse button twice continuously and quickly without moving the pointer. Drag Press and hold the primary mouse button and move the pointer to a certain position. Huawei Proprietary and Confidential Issue 03 (2010-06-05) Copyright © Huawei Technologies Co., Ltd.
  • Page 9: Table Of Contents

    BBU3900 Hardware Maintenance Guide Contents Contents About This Document……………………iii 1 Changes in the BBU3900 Hardware Maintenance Guide……….1-1 2 Maintenance Items for the BBU3900 Equipment…………..2-1 3 Powering On/Off the BBU3900………………..3-1 3.1 Powering On the BBU………………………..3-2 3.2 Powering Off the BBU……………………….3-3 4 Replacing the Components in the OMB…………….4-1 4.1 Replacing the HEUA……………………….4-2…

  • Page 11
    Figure 5-11 Removing the UEIU……………………5-10 Figure 5-12 Position of the FAN unit…………………….5-11 Figure 5-13 Removing the FAN unit…………………….5-12 Figure 5-14 Position of the USCU……………………5-14 Figure 5-15 Disconnecting cables……………………5-14 Issue 03 (2010-06-05) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 12
    Figure 5-18 Disconnecting the cable……………………5-16 Figure 5-19 Removing the WBBP……………………5-17 Figure 5-20 Position of the optical module………………….5-18 Figure 5-21 Disconnecting cables……………………5-19 Figure 5-22 Removing the optical module………………….5-19 Huawei Proprietary and Confidential Issue 03 (2010-06-05) Copyright © Huawei Technologies Co., Ltd.
  • Page 13
    BBU3900 Hardware Maintenance Guide Tables Tables Table 2-1 Maintenance items for the BBU3900 equipment …………….2-1 Issue 03 (2010-06-05) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 15: Changes In The Bbu3900 Hardware Maintenance Guide

    1 Changes in the BBU3900 Hardware Maintenance Guide Changes in the BBU3900 Hardware Maintenance Guide This describes the changes in the BBU3900 Hardware Maintenance Guide 03 (2010-06-05) This is the second commercial release. Compared with issue 02 (2010-03-05), no information is added.

  • Page 16
    BBU3900 1 Changes in the BBU3900 Hardware Maintenance Guide Hardware Maintenance Guide 01 (2008-12-30) This is the initial field trial release. Huawei Proprietary and Confidential Issue 03 (2010-06-05) Copyright © Huawei Technologies Co., Ltd.
  • Page 17: Maintenance Items For The Bbu3900 Equipment

    2 Maintenance Items for the BBU3900 Equipment Maintenance Items for the BBU3900 Equipment This describes the maintenance items for the BBU3900 equipment. The maintenance items are related to the fans, equipment surface, cleanliness, LEDs, and ambient temperature in the cabinet. Table 2-1 describes the maintenance items for the BBU3900 equipment.

  • Page 19: Powering On/Off The Bbu3900

    This describes how to power on and power off the BBU3900. During power-on, you need to check the status of the LEDs on the BBU3900. As for the power-off, the operation in a normal situation and that in an emergency are different.

  • Page 20: Powering On The Bbu

    BBU3900 3 Powering On/Off the BBU3900 Hardware Maintenance Guide 3.1 Powering On the BBU Before powering on the BBU, set the power switch on the BBU to ON and determine the operation status of the BBU based on the status of the LEDs.

  • Page 21: Powering Off The Bbu

    BBU3900 Hardware Maintenance Guide 3 Powering On/Off the BBU3900 3.2 Powering Off the BBU The BBU power-off is classified into normal power-off and emergency power-off. Procedure Step 1 Choose normal power-off or emergency power-off based on the actual situation. If…

  • Page 23: Replacing The Components In The Omb

    4.4 Replacing the AC Surge Protection Box The AC surge protection box provides protection for the AC input power. Issue 03 (2010-06-05) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

  • Page 24: Replacing The Heua

    HEUA in the OMB. Figure 4-1 Position of the HEUA HEUA Procedure Step 1 Wear an ESD wrist strap or a pair of ESD gloves. Huawei Proprietary and Confidential Issue 03 (2010-06-05) Copyright © Huawei Technologies Co., Ltd.

  • Page 25: Figure 4-2 Disconnecting Cables

    Fill in the fault form with the details of the replaced component. Contact the local Huawei office to handle the faulty component. Issue 03 (2010-06-05) Huawei Proprietary and Confidential Copyright ©…

  • Page 26: Replacing The Ac/Dc Power Equipment

    Figure 4-4 Position of the AC/DC power equipment in the cabinet (1) AC/DC power equipment Figure 4-5 shows the positions of the components in the AC/DC power equipment. Huawei Proprietary and Confidential Issue 03 (2010-06-05) Copyright © Huawei Technologies Co., Ltd.

  • Page 27: Figure 4-5 Positions Of The Components In The Ac/Dc Power Equipment

    Step 4 Disconnect the cables. Disconnect the DC output power cable from the PDU, as shown in Figure 4-6. Figure 4-6 Disconnecting the cable from the PDU Issue 03 (2010-06-05) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

  • Page 28: Figure 4-7 Disconnecting The Cable From The Pmu

    Step 5 Remove the component to be replaced. Loosen the M3 screw on the panel of the PDU, and then remove the PDU, as shown in Figure 4-9. Huawei Proprietary and Confidential Issue 03 (2010-06-05) Copyright © Huawei Technologies Co., Ltd.

  • Page 29: Figure 4-9 Removing The Pdu

    Figure 4-10. Figure 4-10 Removing the PSU Loosen the M3 screw on the panel of the PMU, and then remove the PMU, as shown in Figure 4-11. Issue 03 (2010-06-05) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

  • Page 30: Figure 4-11 Removing The Pmu

    Loosen the four M6 screws on the mounting ears of the subrack, and then remove the subrack, as shown in Figure 4-12. Figure 4-12 Removing the subrack Huawei Proprietary and Confidential Issue 03 (2010-06-05) Copyright © Huawei Technologies Co., Ltd.

  • Page 31: Replacing The Dcdu-03B

    Fill in the fault form with the details of the replaced component. Contact the local Huawei office to handle the faulty component. 4.3 Replacing the DCDU-03B The DCDU-03B distributes DC power to different components.

  • Page 32: Figure 4-13 Position Of The Dcdu-03B

    Step 3 Record all the cable connections on the panel of the board to be replaced. Step 4 Disconnect the power cables from the DCDU-03B, as shown in Figure 4-14. 4-10 Huawei Proprietary and Confidential Issue 03 (2010-06-05) Copyright © Huawei Technologies Co., Ltd.

  • Page 33: Figure 4-14 Disconnecting Cables

    Figure 4-14 Disconnecting cables Step 5 Loosen the four M6 screws on the panel, and then remove the DCDU-03B, as shown in Figure 4-15. Figure 4-15 Removing the DCDU-03B Issue 03 (2010-06-05) Huawei Proprietary and Confidential 4-11 Copyright © Huawei Technologies Co., Ltd.

  • Page 34: Replacing The Ac Surge Protection Box

    Fill in the fault form with the details of the replaced component. Contact the local Huawei office to handle the faulty component. 4.4 Replacing the AC Surge Protection Box The AC surge protection box provides protection for the AC input power.

  • Page 35: Figure 4-16 Position Of The Ac Surge Protection Box

    Step 3 Record all the cable connections on the panel of the AC surge protection box to be replaced. Step 4 Disconnect the power cable and monitoring cable from the AC surge protection box, as shown Figure 4-17. Issue 03 (2010-06-05) Huawei Proprietary and Confidential 4-13 Copyright © Huawei Technologies Co., Ltd.

  • Page 36: Figure 4-17 Disconnecting Cables

    1.2 N·m, and then reconnect the cables. Step 7 Power on the base station. Step 8 Take off the ESD wrist strap or gloves, and then pack up all the tools. —-End 4-14 Huawei Proprietary and Confidential Issue 03 (2010-06-05) Copyright © Huawei Technologies Co., Ltd.

  • Page 37
    Fill in the fault form with the details of the replaced component. Contact the local Huawei office to handle the faulty component. Issue 03 (2010-06-05)
  • Page 39: Replacing Components Of The Bbu3900

    BBU3900 Hardware Maintenance Guide 5 Replacing Components of the BBU3900 Replacing Components of the BBU3900 About This Chapter This describes how to replace components of the BBU. The components are the BBU case, boards and module of the BBU, and optical modules.

  • Page 40
    BBU3900 5 Replacing Components of the BBU3900 Hardware Maintenance Guide 5.9 Replacing the WBBP The WCDMA Baseband Process Unit (WBBP) configured in the BBU processes baseband signals. 5.10 Replacing the Optical Module The optical module implements optical-electrical conversion, thus enabling optical transmission between the BBU and other devices.
  • Page 41: Querying Board Information

    BBU3900 Hardware Maintenance Guide 5 Replacing Components of the BBU3900 5.1 Querying Board Information Before replacing a board, you need to query the board information at the remote end to confirm the type of board to be replaced. Run the LST BRDINFO command on the LMT.

  • Page 42: Figure 5-2 Removing The Bbu

    BBU3900 5 Replacing Components of the BBU3900 Hardware Maintenance Guide Step 2 Power off the BBU. For details, see 3.2 Powering Off the BBU. Step 3 Wear an ESD wrist strap or a pair of ESD gloves. WARNING Take proper ESD protection measures, for example, wear an ESD wrist strap or a pair of ESD gloves, to prevent electrostatic damage to the boards, modules, or electronic components.

  • Page 43: Replacing The Wmpt

    Fill in the fault form with the details of the replaced component. Contact the local Huawei office to handle the faulty component. 5.3 Replacing the WMPT The WCDMA Main Processing &…

  • Page 44: Figure 5-4 Disconnecting Cables

    BBU3900 5 Replacing Components of the BBU3900 Hardware Maintenance Guide WARNING Take proper ESD protection measures, for example, wear an ESD wrist strap or a pair of ESD gloves, to prevent electrostatic damage to the boards, modules, or electronic components.

  • Page 45: Replacing The Upeu

    Fill in the fault form with the details of the replaced board. Contact the local Huawei office to handle the faulty board. 5.4 Replacing the UPEU This describes the Universal Power and Environment Interface Unit (UPEU) board.

  • Page 46: Figure 5-7 Disconnecting Cables

    Replacing the UPEU disrupts all the services carried by the base station if no standby UPEU is configured. Step 2 Power off the BBU. For details, see Powering Off the BBU3900. Step 3 Wear an ESD wrist strap or a pair of ESD gloves.

  • Page 47: Replacing The Ueiu

    Fill in the fault form with the details of the replaced board. Contact the local Huawei office to handle the faulty board. 5.5 Replacing the UEIU The Universal Environment Interface Unit (UEIU) provides channels for transmitting the monitoring signals from the service board to the BBU.

  • Page 48: Figure 5-10 Disconnecting Cables

    BBU3900 5 Replacing Components of the BBU3900 Hardware Maintenance Guide Procedure Step 1 Wear an ESD wrist strap or a pair of ESD gloves. WARNING Take proper ESD protection measures, for example, wear an ESD wrist strap or a pair of ESD gloves, to prevent electrostatic damage to the boards, modules, or electronic components.

  • Page 49: Replacing The Fan Unit

    Fill in the fault form with the details of the replaced component. Contact the local Huawei office to handle the faulty component. 5.6 Replacing the FAN Unit The FAN unit is located in the BBU.

  • Page 50: Replacing The Utrp

    Fill in the fault form with the details of the replaced component. Contact the local Huawei office to handle the faulty component. 5.7 Replacing the UTRP The Universal Transmission Processing unit (UTRP) is the BBU transmission extension board.

  • Page 51: Replacing The Uscu

    —-End Postrequisite Record the bar code of the replaced board. Contact the local Huawei office to handle the faulty UTRP. 5.8 Replacing the USCU The Universal Satellite card and Clock Unit (USCU) in the BBU receives clock signals such as the GPS, RGPS, BITS, and M-1PPS signals.

  • Page 52: Figure 5-14 Position Of The Uscu

    BBU3900 5 Replacing Components of the BBU3900 Hardware Maintenance Guide Prerequisite The tools and materials, such as an ESD wrist strap or ESD gloves and screwdriver, are ready. The quantity and type of board to be replaced are confirmed. For details, see 5.1 Querying…

  • Page 53: Replacing The Wbbp

    Fill in the fault form with the details of the replaced component. Contact the local Huawei office to handle the faulty component. 5.9 Replacing the WBBP The WCDMA Baseband Process Unit (WBBP) configured in the BBU processes baseband signals.

  • Page 54: Figure 5-17 Position Of The Wbbp

    BBU3900 5 Replacing Components of the BBU3900 Hardware Maintenance Guide Context Figure 5-17 shows the position of the WBBP in the BBU. Figure 5-17 Position of the WBBP RX TX WBBP CPRI0/EIH0 CPRI1/EIH1 CPRI2/EIH2 WBBP The WBBP is hot-swappable. Procedure…

  • Page 55: Replacing The Optical Module

    Fill in the fault form with the details of the replaced component. Contact the local Huawei office to handle the faulty component. 5.10 Replacing the Optical Module The optical module implements optical-electrical conversion, thus enabling optical transmission between the BBU and other devices.

  • Page 56: Figure 5-20 Position Of The Optical Module

    BBU3900 5 Replacing Components of the BBU3900 Hardware Maintenance Guide Context Figure 5-20 shows the position of the optical module on a board. Figure 5-20 Position of the optical module (1) Optical module The optical module is hot-swappable. Procedure Step 1 Wear an ESD wrist strap or a pair of ESD gloves.

  • Page 57: Figure 5-21 Disconnecting Cables

    BBU3900 Hardware Maintenance Guide 5 Replacing Components of the BBU3900 Figure 5-21 Disconnecting cables WARNING Do not look into the optical module without eye protection after the optical cable is removed from the optical module. Step 5 Turn the puller on the faulty optical module outwards, hold the puller and take the faulty optical…

  • Page 58
    Fill in the fault form with the details of the replaced component. Contact the local Huawei office to handle the faulty component. 5-20 Huawei Proprietary and Confidential Issue 03 (2010-06-05) Copyright ©…

Page 1: Руководство по монтажу  DBS3900

Руководство по монтажу DBS3900

Issue: 13 Date: 2010-07-20

HUAWEI TECHNOLOGIES Co., Ltd.

Page 2: Руководство по монтажу  DBS3900

Copyright © Huawei Technologies Co., Ltd. 2010. All rights reserved.

1

Инструменты

2

Перфоратор (с буромна 14)

Электростатические перчатки

пылесос

фен

Крестовидная отвертка

(M3~M6)

Плоская отвертка

(M3~M6)

Резиновый молоток

обжимные щипцы

устройство для зачистки проводов

нож

ножницы для проволоки

Разводной ключ

(диаметр до 32 mm)

уровень

5mm

M3~M6

вращающаяся отвертка

ключ с регулируемым крутящим

моментом комбинированный гаечный ключ

(21mm~21mm) для монтажа на трубостойку

(17mm~17mm) для монтажа на стену

мультиметр

Маркер

(диметр не более 10мм)

рулетка

Page 3: Руководство по монтажу  DBS3900

Установка RRU

На швеллере На стальном уголке На стене На трубостойке

63 mm to 80 mm

or U-steel

WARNING

• Максимум 2 RRU может быть установлен на трубостойку диаметром от 60 мм до 76 мм, • Только один RRU может быть установлен на швеллере или стальном уголке

63 m

m to

80

mm

30 m

m to

50

mm

3

Кроншейны нельзя объединять при монтаже на стену

Спецификации монтажа RRU на трубостойке, стальном уголке, швеллере .

60 mm to 114 mm

80mm

63mm

50 mm to 100 mm

Metal pole Angle steel U-steel

a

Виды установок

RRU

Угол наклона RRU не более 10 градусов

Page 4: Руководство по монтажу  DBS3900

4

Установка RRU

requirements of the equipment for normal running and Operation and Maintenance (OM) such as checking the When the installation space is restricted, the minimum

Main metal pole metal pole pole

4

Мин.расстояние для RRU на мачте 200 mm

300 mm Top view Side view

Auxiliary metal pole 400 mm 280 mm

280 mm

Main metal Auxiliary

Мин. расстояния для одиночного RRU

The minimum installation clearance meets the

heat dissipation, but does not meet the requirements for

status of the LEDs and opening the maintenance cavity.

installation clearance can be adopted.

200 mm

300 mm

Top view 100 mm 400 mm

600 mm

Рекоменд. расстония для одиночного RRU

requirements of the equipment for normal running and OM.

installation clearance can be adopted.

≥300 mm

≥500 mm

The recommended installation clearance meets the

When the installation space is sufficient, the recommended

Размеры RRU

380 mm 170 mm

485 mm

b Размеры и растояния

Page 5: Руководство по монтажу  DBS3900

Установка RRU

5

Minimum Vertical Spacing for Two RRUs Installed in Parallel

200 mm

300 mm

300 mm

Recommended Vertical Spacing for Two RRUs Installed in Parallel

≥300 mm

≥500 mm

≥500 mm

Minimum Horizontal Spacing for Two RRUs Installed in Parallel

100 mm 400 mm 400 mm

Recommended Horizontal Spacing for Two RRUs Installed in Parallel

≥300 mm ≥600 mm ≥600 mm

b Расстояния между блоками

Page 6: Руководство по монтажу  DBS3900

Установка RRU

1. Установка основного кронштейна.

1200 mm~1600 mm

2. Используйте разводной ключ, чтобы затянуть гайку на 40 Н•м.

40N•m

3. Установить RRU на соновном кронштейне. Когда вы услышите щелчёк, можно сделать вывод, что RRU зафиксирован.

ports at the bottom of the RRU is low. Do

pad or cardboard under the RRU to the RRU.

7

z The weight-bearing capacity of the RF

not place the RRU at its bottom. z During the operation, place the foam

prevent any damage to the housing of

Fasten the two dual-nut bolt assemblies alternatively. After the brackets are secure, use a tape to measure the spacing between the main bracket and the auxiliary bracket at the two sides and ensure that the spacing is the same.

You may fit one end of the auxiliary bracket on one dual-nut bolt assembly and then the other end on the other dual-nut bolt assembly during the installation.

When installing the main bracket, ensure that the contact piece on the bracket is fixed.

e Установка одиночного RRU на трубостойке

Page 7: Руководство по монтажу  DBS3900

Установка RRU

1. Установите RRU см. стр. 7

2. Установите основной кронштейн для другого RRU.

3. Поменяйте местами накладные пластины и накладку на втором RRU.

M6X16

5N•m

4. Установите второй RRU на основной кронштейн. Перевернутое положение Стандартное

положение

Кабельная полость

8

Убедитесь что кабельные полости двух RRU смотрят в одном направлении.

f

Установка 2-х RRU Спина-к-Спина на трубостойке

Page 8: Руководство по монтажу  DBS3900

Установка RRU Установка RRU

вид сверху

Швеллер

вид сверху

Стальной уголок

9

• процедура установки RRU на стальном уголке аналогична установке на трубостойке. • только один RRU можно закрепить на стальном уголке.

h

Установка RRU на стальном уголке

• процедура установки RRU на швеллере аналогична установке на трубостойке. • только один RRU можно закрепить на швеллере.

g

Установка RRU на швеллер

Page 9: Руководство по монтажу  DBS3900

for

Установка RRU

Аварийный кабель RRU Оптический кабель CPRI Силовой кабель RRU -48V RF-сабель между RFU Кабель AISG между RRU и RCU RRU RF джампер фидер AISG расширенный кабель между RRU и RCU Кабель PGND

Install the RF jumper

RCU

Install the DC RRU alarm

Install the AISG multi-wire cable

Install the AISG multi-wire cable

Опт. кабель CPRI RRU кабель питания RRU джампер

PGND кабель SFPвысокоскор.кабель каскадирования RRU авар. кабель

Блок внешней аварийной сигнализации

15

Ant

enna

• RRU не поддерживают каскадирование кабелей питания. • В случае каскадирования двух или более RRU в одном секторе (или в случае расширения

емкости), кабель аваррийной сигнализации должен быть подключен к RRU нижнего уровня.

вторичное эл.питание

l

Подключение кабелей составных RRU

When a dual-polarized antenna is shared by two RRUs in the same sector, the two RRUs are connected through an RF cable between RFUs. The connections of three RRUs in the same sector are not supported.

Блок внешней аварийной сигнализации

вторичное эл.питание

between the RRU and the RCU (optional)

between the RRU and the RCU (optional)

cable(optional)

Install the CPRI optical cable

Install the DC RRU power cable

(RF cable between RFUs is optional)

Install the PGND cable

k

Подключение кабелей для одиночного RRU

Page 10: Руководство по монтажу  DBS3900

17

Cable

Connected to…

SFP high-speed cable for cascading

SFP200 male connector

the CPRI_E port on the upper-level RRU

SFP200 male connector

the CPRI_W port on the lower-level RRU

l

Установка RRU

Список кабелей Кабель Тип коннектора Подключен к….

OT коннектор ( M6 ) болт заземления на RRU

OT коннектор ( M8 ) ближайшая шина заземления

PGND кабель (16 mm²)

DIN коннектор «папа» порт маркированный ANT-A и ANT-B на RRU

DIN коннектор «папа» фидер или антенна

RRU RF jumper

Two OT коннектор ( M4 ) OT коннектор на на синем проводе подключен к

NEG(-) контакту в RRU. The OT коннекторна коричневом(черном) проводе подключен к RTN(+) контакту в RRU

Bare wire External power supply

DC RRU power cable ( North American standard: 12AWG European standard: 4 mm² )

DLC коннектор Connect the fiber tails labeled 1A and 1B to the

CPRI_W port on the RRU

DLC коннектор Connect the fiber tails labeled 2A and 2B to one of the CPRI0 to CPRI5 ports on the GTMU

CPRI optical cable

SFP200 коннектор «папа» CPRI_E port в RRU верхнего уровня

SFP200 коннектор «папа» CPRI_W порт в RRU нижнего уровля

высокоскоростной себель SFP для каскадерования

Page 11: Руководство по монтажу  DBS3900

Установка RRU

1. Откройте крышку кабельной полости на RRU

M4

2. Кабельная полость RRU

Кабельный лоток для силового кабеля

power cable Кабельный лоток для оптического кабеля

Кабельный лоток для оптического кабеля

Reference for making the power cable

Cabling cavity

Cover plate of the cabling cavity

Гидроизоляционный наполнитель

18

m

Установка кабелей RRU

Page 12: Руководство по монтажу  DBS3900

Установка RRU

3. Cable Connections of RRU

RRU аварийный кабель

CPRI опт. кабель

RRU силовой кабель

PGND кабель

RRU RF джампер

Оплетка силового кабеля

Кабель с гидрозащитой

Сначала намотайте сырую резину, затем ПВХ изоленту.

4. Закрытие крышки кабельной полости на RRU.

shown in the figure.

cabling cavity. If the cable trough is used by the CPRI

cable trough near the middle one. In this case, the

waterproof tape so that the diameter of the cable M4

pressed by the strap next to the power cable during

cable trough. 1.4N•m

• Лента оборачивается спирально вверх, вниз, вверх, а затем снова, в три слоя. Вышележаший слой перекрывает на 50% нижний слой.

• Не снимайте пылезащитный колпачок разъема фидера, которые не используются. Кроме того, меры по защите от влаги, пыли и тумана соли должны быть приняты. Если RRU устанавливается на открытом воздухе, вам также необходимо сделать гидрозащиту коннекторов

until the fastening torque is 14 kgf•cm. For details on how to add the OT terminals to the DC RRU power cable, see page 45.

19

z The screw on the cover plate is tightened

z The screws on the cover plate are tightened in the order shown in the preceding figure.

z Press the strap on the exposed shielding layer of the power cable tightly. Ensure that the lower edge of the exposed shield layer does not exceed the position

z The alarm cable is preferably led out of the RRU from the narrower cable trough in the middle of the

optical cable, the alarm cable is led from the wider

alarm cable must be wrapped with 10 to 17 layers of

reaches 10 mm to 12 mm. z To avoid sharp bending, the optical cable must be

the optical cable installation. z Waterproof fillers should be installed in the unused

Case 1 Case 2

n

Установка кабелей RRU

Page 13: Руководство по монтажу  DBS3900

Установка RRU

BBU

DCDU-03B

LOAD0

Оплетка силового кабеля RRU

24

• сил.кабель RRU -48В подключается к одному из териналов LOAD0 .. LOAD5 в блоке DCDU-03B. • при подключении сил.кабеля RRU к блоку DCDU-03B, нужно добавить наконечник OT к оплетке

силового кабеля. Затем, подключите OT наконечник к соответствующему PGND терминалу в блоке DCDU-03B.

(1) RRU сил.кабель -48В

(2) CPRI опт. кабель

o

RRU+19’ стойка.

Page 14: Руководство по монтажу  DBS3900

Appendix

1. Bind the RRU by leading the lifting rope along the lower part of the adapting piece and through the handle, bind the main and auxiliary brackets with the lifting rope, and then bind the steering rope with the handle of the RRU, as shown in the following figures.

Подъемный трос

Нижняя часть кронштейна

Рулевой трос

• при подъеме RRU и компонентов избгайте столкновения RRU с башней.

• Сечение веревки около 20 мм, но не более 25мм. Кроме того, веревка должна выдерживать четырехкратный вес RRU

43

Не привязывайте веревку только к ручке для подъема RRU.

a Binding the RRU and Installation Components

Установка RRU Подготовка к установке

Дополнительный кронштейн

Основной кронштейн

Декоративная крышка

Соединительная пластина

Болт с двойной гайкой

Page 15: Руководство по монтажу  DBS3900

Appendix

2. Lifting the RRU and Installation Components to the Tower

Pulley

Steering rope A fixes the pulley to the support of the tower pulley.

Lifting rope and installation components as shown in the rope at the handle of the RRU.

time, installer C pulls the steering rope away from components from colliding with the tower.

components and untie the ropes.

3. Lifting the CPRI Optical Cable up to the Tower

z Отрежьте гофрированные трубы диаметром 25 мм и длиной 200 мм.

z. Ведущий хвосты волокна помечены 1А и 1В оптического кабеля в гофрированную трубу на 160 мм

z Намотайте на гофротрубку и оптический кабель цветную изоленту

z For the tower made of steel pipes, tie the black jacket to the corrugated pipe at the position 150 mm away from the color tape, and then lift the optical cable up to the tower.

z For the tower made of angle steel girders, carry the optical cable onto the tower when climbing up to the tower.

z После поднятия оптических кабелей на башню, удалите цветную изоленту и гофротрубку

Corrugated pipe

Color tape

44

z Installer A climbs onto the tower. Then, installer

platform and leads the lifting rope through the

z Installer C uses a lifting rope to bind the RRU

preceding figure and then ties a knot in the steering

z Installer B pulls the lifting rope, and at the same

the tower to prevent the RRU and installation

z Installer A holds the RRU and installation

a

Binding the RRU and Installation Components

Page 16: Руководство по монтажу  DBS3900

Appendix

Добавьте два ОТ наконечника на сил.кабель подключаемый к RRU.

-48V DC power cable NEG ( — ) Label for preparing the power cable

OT terminals

RTN ( + ) Shielding layer

Determine lengths of power cables for different operations according to the scales on the inner side of the cover plate of the cabling cavity.

0 10 20 30 40

Based on the determined length, remove the jacket and shielding layer off the power cable.

14mm

Remove the jacket from each wire.

8mm

Add an OT terminal to each wire.

Strip a 15 mm jacket off the power cable to reveal the shielding layer of the power cable

15mm

45

The assembling of OT terminals to the power cable must be complete before the RRU is installed on a metal pole.

b

Изготовление OT терминалов

Page 17: Руководство по монтажу  DBS3900

Appendix

Lead the wires made of the shielding layers through heat- shrinkable tubes.

Wrap the PVC insulating tape at the joint where the three wires meet.

OT terminal on the shielding layer

46

ВНИМАНИЕ

Не повредите оплетку кабеля когда срезаете оболочку.

c

Добавление OT наконечников на силовой кабель на стороне DCDU

Page 18: Руководство по монтажу  DBS3900

Appendix

.

изолента Сырая резина

• Гидрозащита должна выступать на 20 мм от обоих краев разъемов. Сыр.резина и изоленты наматываются на коннекторы снизу вверх • При наматывании нового слоя изоленту нельзя обрезать. • При наматывании сырой резины ее следует вытягивать, что бы она стала вдвое уже первоначальной длины. • При наматывании сырой резины, последующий слой должен перекрывать предыдущий на 50% • Изолента должна выступать на 20 мм от обоих краев разъемов. • Последний слой сырой резины наматывается снизу вверх для предотвражения затекания воды через изоленту

1. Намотайте три слоя сырой резины.

Спрессуйте сырую резину

2. Намотайте три слоя изоленты. стреп

стреп

Закрепите стрепы с обоих сторон ends of the tape

Сптрессуйте изоленту

47

e

Установка оптического модуля

d

Гидроизоляция наружных кабелей

Оптический модуль вставлять ДО УПОРА!

Page 19: Руководство по монтажу  DBS3900

AУстаноppendix

Подключение кабелей BBU

Место подключения N Кабель Один конец подключен к….. Другой конец подключен к…

1 CPRI signal cable В порт CPRI на плате GTMU В CPRI порт на RRU 2 E1T1 cable BBU кросс 3 Кабель питания BBU PWR1 на плате UPEU LOAD6 на DCDU-03B 4 Кабель аварии DCDU-

03B EXT-ALM1 на плате UEIU SPD-ALM на DCDU-03B

5 Кабель внешних аварий MON1 на плате UEIU RS-485 на EMUA

Page 20: Руководство по монтажу  DBS3900

Монтаж BBU в стойку 19’

Место подключения N Кабель

Один конец подключен к….. Другой конец подключен к… 1 CPRI опт. кабель В порт CPRI на плате GTMU В CPRI порт на RRU 2 кабель внешенего

питания BEG(-) и RTN(+) на DCDU-03B

Внешнее силовое оборудование

3 Кабель питания BBU PWR1 на плате UPEU LOAD6 на DCDU-03B

Понравилась статья? Поделить с друзьями:
  • Гальванизатор поток 1 инструкция по применению в домашних
  • Cortex m4 руководство по программированию
  • Как сшить накидку на кресло своими руками пошаговая инструкция
  • Структура руководства газеты
  • Капли для глаз тауфон инструкция по применению цена отзывы аналоги